Breaker panel next to a brick wall with new breakers and labelled circuits
  1. Home
  2. Panel Upgrades

Electrical panel upgrades in Woodbridge

Full panels, subpanels for additions and finished basements, and service upgrades. What each involves and how we choose between them.

Full panel, subpanel or service upgrade

Woodbridge homes are bigger than average and many already have 200 A. The problem is usually space in the panel, not the size of the service. Three ways to solve it:

  • Subpanel: a second panel fed from the main, often in the basement or garage, for a renovation or addition.
  • Panel replacement: a new main panel when the old one is full, damaged or an older type insurers flag.
  • Service upgrade: more amperage into the house, with a new meter base, when the load calculation says 200 A is not enough or a 100 A home needs more.
Breaker panel next to a brick wall with new breakers and labelled circuits
CompletedA panel with new breakers and a fully labelled directory.

How a service upgrade runs

For a full upgrade, the order is:

  1. Load calculation. Including what you plan to add: pool equipment, a hot tub, a second kitchen, EV charging or a heat pump.
  2. ESA notification. Filed with the Electrical Safety Authority before work starts.
  3. Alectra scheduling. Alectra Utilities disconnects and reconnects the service.
  4. Replacement. Meter base where needed, new panel and main breaker, circuits reconnected and labelled.
  5. Inspection. ESA inspects, Alectra reconnects and every circuit is tested.
New meter base mounted on exterior sheathing during a service change
In progressNew meter base on the exterior wall during a service change.

Woodbridge additions, basements and outdoor loads

In East Woodbridge, Vellore Village and Sonoma Heights, finished basements with a second kitchen are common, and so are pool heaters, hot tubs and landscape lighting added over the years. Each takes panel spaces, and that is usually what pushes a homeowner to call.

Older homes near the Woodbridge core and along the Humber are more likely to have 100 A and a panel that has been extended many times. There a service upgrade is often the cleanest fix.

Planning a renovation? Bring us in at the rough-in stage, as described on the residential upgrades page, so the panel is sized once.

What changes the price

  • Subpanel, panel replacement or full service upgrade.
  • Overhead or underground service entry.
  • Distance to a subpanel location in a garage or addition.
  • Finished walls and ceilings around the work.

Questions

Do I need a new panel for a finished basement?

Often a subpanel is enough. The load calculation tells us whether the service can carry the extra load.

How long is the power off?

Most of a day for a service upgrade, less for a subpanel.

Is the work inspected?

Yes. Every panel job is filed with the Electrical Safety Authority and inspected.

Out of panel space?

Tell us what you are adding and send a photo of the panel with the door open. We will tell you whether a subpanel, a new panel or a service upgrade makes sense.

Call 647-493-3360

Contact us